National Highways planned roadworks · England · updated weekly

M53 Closures Tonight and This Week

National Highways lists 15 planned roadworks on the M53 between now and 3 November, 8 of them with a carriageway, slip-road or junction closure. Tonight: 3 closures — M53 both directions J7 to J9 - carriageway closure for carriageway - reconstruction/renewal.

Live traffic: Traffic England ↗ All motorways tonight UK weather warnings

Planned works on the M53, next two weeks 15

RoadWhatFromToDelay
M53Closure M53 both directions Jct 4 to Jct 5 - carriageway closure for structure - maintenance on behalf of National HighwaysSat 9 May 20:00Sat 7 Nov 06:00Slight (less than 10 mins)
M53, M56Closure M53 both directions J7 to J9 - carriageway closure for carriageway - reconstruction/renewalMon 6 Jul 20:00Sat 12 Dec 06:00Moderate (10 - 30 mins)
A494, A5117, M53, M56Closure M56 both directions J14 to J16 - carriageway closure for carriageway - reconstruction/renewal on behalf of National HighwaysMon 20 Jul 20:00Sat 31 Oct 06:00Moderate (10 - 30 mins)
M53M53 both directions J3 to J1 - narrow lanes for structure - new/reconstruction on behalf of National HighwaysWed 5 Aug 05:00Mon 20 Dec 21:00Moderate (10 - 30 mins)
M53M53 Northbound Jct 4 entry and exit slip road lane closure due to works on verge for ManwebMon 12 Oct 09:30Fri 23 Oct 15:30Slight (less than 10 mins)
M53M53 both directions Ellesmere Port to Birkenhead - lane closure for inspection/survey on behalf of National HighwaysMon 12 Oct 20:00Sat 31 Oct 05:00Slight (less than 10 mins)
A41, M53Closure M53 Northbound and Southbound Junction 7 to Junction 5 - Carriageway Closure for Drainage on behalf of AmeySat 24 Oct 21:00Sun 25 Oct 06:00Moderate (10 - 30 mins)
A494, M53, M56Closure M56 eastbound J16 to J14 - carriageway closure for drainage on behalf of National HighwaysSun 25 Oct 21:00Mon 26 Oct 06:00Moderate (10 - 30 mins)
M53M53 both directions J3 to J2 - lane closure for construction - bridge/structure on behalf of National HighwaysMon 26 Oct 20:00Tue 27 Oct 06:00Moderate (10 - 30 mins)
M53M53 westbound 2 to 2 - lane closure for barriers - permanent on behalf of National HighwaysTue 27 Oct 21:00Thu 29 Oct 05:00Slight (less than 10 mins)
M53Closure M53 both directions J3 to J1 - carriageway closure for drainage on behalf of National HighwaysWed 28 Oct 21:00Thu 29 Oct 06:00Moderate (10 - 30 mins)
M53M53 southbound Jct 8 to Jct 8 - lane closure for lha works on behalf of Cheshire West And Chester CouncilThu 29 Oct 20:00Thu 5 Nov 05:00Slight (less than 10 mins)
M53M53 both directions 1 to 3 - lane closure for barriers - permanent on behalf of National HighwaysThu 29 Oct 21:00Sat 31 Oct 05:00Slight (less than 10 mins)
A55, M53, M56Closure M53 southbound Jct 7 to 10 - carriageway closure for horticulture (cutting and planting) on behalf of National HighwaysSat 31 Oct 21:00Sun 1 Nov 06:00Moderate (10 - 30 mins)
A41, A550, M53Closure M53 Northbound and Southbound junction 1 to 3 carriageway closure for DrainageMon 2 Nov 21:00Tue 3 Nov 06:00Moderate (10 - 30 mins)

Driving through roadworks

  • Check before you set off — planned works can be cancelled or moved for weather, and incidents are not in this list.
  • Follow the signed diversion; satnavs often do not know about overnight closures.
  • Keep to the temporary speed limit — average-speed cameras are common in roadworks.
  • Broken down in roadworks without a hard shoulder? Hazard lights on, leave by the left if safe, and call 999.

What this page shows, and what it misses

Planned works on the roads National Highways runs in England — motorways and major A roads — from its weekly published roadworks file, for about two weeks ahead. "Closure" means the description mentions a carriageway, slip-road or junction closure; other works are lane closures, speed limits or hard-shoulder closures. Local council roads, Scotland, Wales and unplanned incidents are not included.

Contains public sector information from National Highways licensed under the Open Government Licence v3.0.